
WA_DEV_FEX20_UGD_002 Rev 004 March 08, 2011 118
Fastrack Xtend User Guide
Reliability Compliance and
Recommended Standards
16.3.2.6. Handling Resistance Stress Tests
The following tests the Fastrack Xtend‟s resistance to handling malfunctions and damage.
Table 98. Handling Resistance Stress Tests
Special conditions:
Contact discharges: 10 positive and 10 negative applied
Voltage: ±2kV, ±4kV, ±6kV
Operating conditions: Powered
Operational Durability
OD
Special Conditions:
SIM Connector:
Cycles: 40
Repetition Rate: 3s per cycle
Objective: Mating and de-mating
System Connector:
Cycles: 40
Repetition Rate: 3s per cycle
Objective: Mating and de-mating
RF Connector:
Cycles: 20
Repetition Rate: 5s per cycle
Objective: Mating and de-mating
Operating conditions: Un-powered
Standard : IEC 60068-2-32, Test Ed
Special conditions:
Drop: 2 samples for each direction
Equivalent drop height: 1.5m
Number of directions: 6 (±X, ±Y, ±Z)
Number of drops/face: 2
Operating conditions: Un-powered
Commentaires sur ces manuels